The 9019c Valve has been proven by more than 25 years use
on the landing gear of every aircraft on which you have ever flown.
DO NOT REPLACE IT!

![]() |
CUSHION PRE-FILL With the preventor connected to the pipework as shown in the appropriate illus. (A-D), but no pressure in the pipe, the preventor cushion bonnet shall be filled through the valve that LDI has provided. Fill to a pressure (calculated on the absolute scale), or 80% (or thereabout) of the theoretical steady state system pressure. Note: Use only Commercially Pure Nitrogen to avoid "dieseling" or membrane permeation/blistering. CUSHION PRE-FILL PROCEDURE (see Figure 1) 1. Remove 1/4" pipe plug (2). Loosen pre-fill valve 003-150000 (1) by turning 1/2 turn counterclockwise. The sealing point (4) will move away from the valve seat (3). |
![]() |
SPARES & SERVICES INDEX |
![]() |
Pre-Fill Valve - Low Pressure
|
| Chuck 5560 with center pin depressor for use with LP Valve 2581 shown right (see diaphragm) The cushion pre-fill procedure is similar to other dampers, but the fill connection used is Pt. No. 2581, and this requires that you use chuck - Pt. No. 5560, which has a 1/8 NPT male end, so the hose referred to must have an 1/8" female end. |
|
To top of page
Return to More Elastomers
|