FOOD, DRUG, BEVERAGE, BIO-CHEM., & HPLC

|
|
|
To enable for you to receive exactly what you need, please read our definition of SMOOTHNESS & CLEANESS: |
SOME OF THE MOST POPULAR CLEAN DAMPERS,
|
|||
|
These options impact both cost and lead time availability. If you require definiton please call 1-888-DAMPERS
|
|||
|
The PipeHugger BLTD |
FLUSHABLE (LEAST CLEAN) |
||
|
|
|
||
The TubeGuard Printable Dimensional Drawing When your hot Lye, dilute Nitric, and flush cycles are below process pressure, the diaphragm must not be driven down by the cushion pre-fill set pressure. Transfer fluid volume is set, so diaphragm can not mask, the surfaces to be cleaned. SIZES:- 0.25 Liter 15 in3 to 1,000 in3, 16 Liter DuPont Teflon and Elastomer versions available. Note: These are not "on the shelf" Inventory items. |
|
||
The HPLCguard C.I.P. - Widely spaced inlet and outlet plus small entrained volume + smooth virgin PTFE ensure full scouring at high velocity. Use, High Pressure Liquid Chromatography SIZES: 0.13 to 2.5 Liter, 8 to 150 in3 |
|
||
The HPLC Can be F.I.P., C.I.P., H.I.P., or S.I.P. (see above for abbr. explanation) at below process pressure depending on :- VELOCITY DURATION And FLUSHANT. |
MOST CLEAN ![]() |
||
|
Suction Systems |
|
"Qwik Klamp" up to 12" only, and very low pressure
|
||||||||||
![]() |
Qwik Klamp types: | |||||||||
| CB, Cherry Burrell | SP, SanPro Kynar | |||||||||
| SPI, Valex, Stainless Producs Inc CA. | TC, Tri-Clover | |||||||||
|
||||||||||
5 MINUTE DOWN TIME *MOUNTING BLOCK / Piping Base Products
WARNING Pulse Dampers may be engergy sotring, Proceed with EXTREME CARE* THE PIPEHUGGER Bolted configuration
The bolted damper capsule body also speeds & simplifies dissassemble compared to the tamperproof segmental lock ring standard.
1 - Release the DAMPER CAPSULE A from the MOUNTING BLOCK B piping base by removing bolts C (NB. Not stressed for pipe loadings) NEVER RESTRAIN THE DAMPER CAPSULE
2 - Open Cushion Pre-Fill Valve9019c, pt. D (see schematic) by removing the yellow sealing cap, and turning the 3/4" AF swivel nut. When all pre-fill pressure is realsed, unscrew the valve body and set carefully aside.3 - Without scratching the sealing for Valve D stand capsule on dome end E. Remove all of 4, 8, or 12 bolts F
4 - Using Jacking bolts G lift base plate H out of dome E.
5 - Place base plate on a smooth clean surface so as not to damage sealing surface M. Remove bladder J and "O" seal, K, place them in a plastic bag, seal the bag, & return it to factory immediately.To top of page
Return to Main Index Page